Concrete Calculator
To find cubic yards of concrete, multiply length by width by thickness in feet, then divide by 27. One cubic yard takes about 45 bags of 80 lb mix at 0.60 cubic feet per bag.
Find Your Concrete Amount
Pick a shape, enter the size, then pick a bag size and how much extra to add.
2.37
cubic yards of concrete to fill this shape, before any extra.
192 sq ft, 64 cu ft
Material List
These figures include the extra you picked. Bag yields are for Quikrete Concrete Mix.
How It Works
The calculator finds the volume of your shape in cubic feet, then divides by 27 to get cubic yards. Inches are divided by 12 first, so every measurement is in feet. For bags, it adds the extra you picked, divides by the yield of one bag, and rounds up, since you cannot buy part of a bag.
Slab = length x width x (thickness / 12)Footing = length x (width / 12) x (depth / 12)Round tube = 3.1416 x (diameter / 24) x (diameter / 24) x height x how manySquare column = (side / 12) x (side / 12) x height x how manyCubic yards = cubic feet / 27Bags = cubic feet with extra / yield per bag, rounded upA cubic yard is 27 cubic feet, per NIST Handbook 44. A footing here means a long strip, so enter its total length in feet. This tool works out the volume of a footing or column you have already sized. It does not size them, so take those dimensions from your plans or your local building department.
Worked Example
Here is the math for a patio slab that is 16 feet long, 12 feet wide, and 4 inches thick, using 80 lb bags and 10 percent extra.
- 16 ft x 12 ft = 192 sq ft
- 192 sq ft x 4 in / 12 = 64 cu ft
- 64 cu ft / 27 = 2.37 cu yd
- 64 cu ft x 1.10 = 70.4 cu ft, or 2.61 cu yd with extra
- 70.4 cu ft / 0.60 cu ft = 117.3 bags, rounded up to 118 bags
Four tubes 12 inches across and 4 feet tall come to 12.57 cubic feet, or 0.47 cubic yards. With 10 percent extra, that is 13.82 cubic feet, or 24 bags of 80 lb mix.
Bag Yields and Coverage
A bag lists how much mixed concrete it makes, called its yield. These are approximate figures from the Quikrete Concrete Mix data sheet, and the coverage column is the yield spread 4 inches thick.
| Bag Size | Yield | Bags per Cubic Yard | Sq Ft at 4 in Thick |
|---|---|---|---|
| 40 lb | 0.30 cu ft | 90 | 0.90 |
| 50 lb | 0.375 cu ft | 72 | 1.13 |
| 60 lb | 0.45 cu ft | 60 | 1.35 |
| 80 lb | 0.60 cu ft | 45 | 1.80 |
| 90 lb | 0.675 cu ft | 40 | 2.03 |
For more bag counts by slab size, see How Many Bags of Concrete Do I Need?
Cubic Yards by Slab Size and Thickness
Use this table for a quick ready-mix estimate. A 400 square foot slab at 4 inches thick takes 4.94 cubic yards, with nothing added for waste.
| Slab Area | 3 1/2 in | 4 in | 5 in | 6 in |
|---|---|---|---|---|
| 50 sq ft | 0.54 | 0.62 | 0.77 | 0.93 |
| 100 sq ft | 1.08 | 1.23 | 1.54 | 1.85 |
| 200 sq ft | 2.16 | 2.47 | 3.09 | 3.70 |
| 400 sq ft | 4.32 | 4.94 | 6.17 | 7.41 |
| 600 sq ft | 6.48 | 7.41 | 9.26 | 11.11 |
| 1,000 sq ft | 10.80 | 12.35 | 15.43 | 18.52 |
Typical Slab Thickness
Thickness has a large effect on your total, so settle it before you buy. These are Quikrete’s figures for common jobs. They are not code values, and your plans or local rules may call for something else.
| Project | Thickness |
|---|---|
| Patio on 2 by 4 forms | 3 1/2 in |
| Sidewalk | At least 4 in |
| Driveway, passenger cars | 4 in |
| Driveway, trucks and other heavy vehicles | 5 or 6 in |
| Simple slabs for small foundations and bases | 4 to 6 in, by load |
Quikrete says sections thinner than about 3 1/2 inches crack too easily, though it calls 2 inches adequate for smaller sections, such as those made with its Walk Maker. It designs its Concrete Mix for pours 2 inches thick or more. With 2 by 4 forms, its patio instructions allow 3 1/2 inches for the concrete, so enter 3.5 in the calculator.
Round Tubes by Diameter
For round tubes, volume depends on the square of the diameter, so a 12 inch tube holds 2.25 times as much as an 8 inch tube of the same height. The bag counts below have nothing added for waste.
| Diameter | Cu Ft per Foot of Height | Cu Ft, 4 ft Tall | 80 lb Bags, 4 ft Tall |
|---|---|---|---|
| 6 in | 0.20 | 0.79 | 2 |
| 8 in | 0.35 | 1.40 | 3 |
| 10 in | 0.55 | 2.18 | 4 |
| 12 in | 0.79 | 3.14 | 6 |
| 16 in | 1.40 | 5.59 | 10 |
| 18 in | 1.77 | 7.07 | 12 |
The 6 to 12 inch bag counts match the capacity table on the Quikrete QUIK-TUBE data sheet.
Why You Add Extra
The volume from your plan is the space to fill, and real jobs take more. The National Ready Mixed Concrete Association lists waste and spillage, over-excavation, and spreading forms among the usual reasons. It says to order 4 to 10 percent more than the volume worked out from plan dimensions, and Sakrete says to add 10 percent to every estimate.
Small errors add up. The association notes that a slab just 1/8 inch thicker than planned at 4 inches would leave you 3 percent short, so measure your forms in several spots and check the base before you order.
Bags or a Ready-Mix Truck?
Bags suit small jobs, and the weight is the thing to plan for. The patio above takes 118 bags of 80 lb mix, which is 9,440 pounds of dry mix to move and mix. Sakrete says a pallet of bags is about a cubic yard as a rough rule, and that it takes 45 bags of 80 lb mix to reach a full yard.
Ready mix is sold by the cubic yard, and truck mixers hold 8 to 12 cubic yards, according to the National Ready Mixed Concrete Association. It says to place your order well in advance, give the producer the address and the nature of the job, and avoid small clean-up loads. Ask your local supplier about any minimum order or delivery fee before you pick a method.
Frequently Asked Questions
These cover the questions that come up most often.
How Many Bags of Concrete Are in a Yard?
A cubic yard is 27 cubic feet, so it takes 45 bags of 80 lb mix at 0.60 cubic feet per bag, 60 bags of 60 lb mix at 0.45 cubic feet, or 90 bags of 40 lb mix at 0.30 cubic feet. Those yields are for Quikrete Concrete Mix, so check your own bag.
How Much Does a Yard of Concrete Weigh?
The National Ready Mixed Concrete Association puts normalweight concrete at 140 to 150 pounds per cubic foot. Multiplied by 27 cubic feet, that is about 3,780 to 4,050 pounds per cubic yard.
How Thick Should a Concrete Slab Be?
Quikrete says the normal thickness for a patio, sidewalk, or driveway is about 3 1/2 inches, the height of a 2 by 4. It says 4 inches is sufficient for a driveway that serves only passenger cars, and that sidewalks should be at least 4 inches. For trucks and other heavy vehicles, it recommends 5 or 6 inches. Plans or local rules may call for something else.
How Far Does a Yard of Concrete Go?
One cubic yard covers 81 square feet at 4 inches thick, 64.8 square feet at 5 inches, and 54 square feet at 6 inches.
How Much Extra Concrete Should I Order?
The National Ready Mixed Concrete Association says to order 4 to 10 percent more than the volume worked out from plan dimensions. Sakrete says to add 10 percent to every estimate.
Sources
Every figure on this page comes from the sources below, or from the math shown.
- NIST Handbook 44, Appendix C: General Tables of Units of Measurement
- Quikrete, Concrete Mix No. 1101 Data Sheet
- Quikrete, QUIK-TUBE Building Form Data Sheet
- Quikrete, Concrete Driveways and Curbs
- Quikrete, Concrete Sidewalks and Small Slabs
- Quikrete, Building a Concrete Patio
- Quikrete, Frequently Asked Questions
- Sakrete, Estimating Bagged Concrete Jobs
- National Ready Mixed Concrete Association, CIP 31: Ordering Ready Mixed Concrete
- National Ready Mixed Concrete Association, CIP 8: Discrepancies in Yield
- National Ready Mixed Concrete Association, CIP 36: Structural Lightweight Concrete
This result is an estimate. Check your measurements before you order. If we got something wrong, please contact us.